A 500,000 sqft. Midwest distribution warehouse had forklift-bouncing slabs damaging equipment and shifting product. We stabilized 44,000 sqft. of dock and staging area flooring in under 24 hours, with zero business interruption.
After years of heavy forklift traffic, shifting and rocking concrete slabs in the warehouse were causing equipment to bounce when crossing joint lines. Continued rocking destabilized the soil beneath the slabs, creating voids large enough that forklifts could fall through. Product was shifting mid-transport, and maintenance costs on forklift tires and equipment were climbing.
Stratalock developed a targeted injection plan to stabilize over 44,000 sqft. of dock and staging area flooring. Polymer was injected throughout the treatment area with a laser level guiding the floor back to an even, stable surface. The full project was completed overnight during a weekend, start to finish in under 24 hours, with no interruption to the customer's business.
Get a free assessment from our geotechnical experts and discover how our deep soil injection can stabilize your foundation—fast.